Projekt-ID: #20251014_TBESS EPC

TBESS EPC

OFFEN
works
08.12.25 Frist

Projektbeschreibung

The subject matter of the contract is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 80 MW of active power consumption and feed-in and a usable storage capacity of at least 160 MWh at the time of commissioning. It also within the allocated land plot. includes the inverters and transformer stations since there is 33 kV voltage at the grid connection point, as well as the electrical connection 33kV switching station up to the connection point at the point of connection of the transformer stations to the grid connection point and all ancillary equipment and infrastructure necessary for proper and safe operation. Construction will take place on the site of Trianel Batteriepark Waltrop GmbH & Co. KG (TBW) in 45731 Waltrop, Germany. For further information please see tender documents.

Lose

1 Los

For further information please see tender documents.

KI-Analyse

Keine Dokumente vorhanden

Für diese Ausschreibung liegen keine Vergabeunterlagen vor. Die KI-gestützte Dokumentenanalyse kann nur durchgeführt werden, wenn Dokumente verfügbar sind.

KI-Analyse-Kontingent erschöpft

0 / 0

Dein aktueller Plan hat das KI-Analyse-Limit erreicht. Upgrade auf Professional für mehr Analysen — oder Enterprise für unbegrenzte.

Vergabeunterlagen

Noch keine Vergabeunterlagen verfügbar.

Vormerkungen-Limit erreicht

0 / 5

Im Basis-Tarif kannst du bis zu 5 Ausschreibungen vormerken. Hol dir Professional für bis zu 100 — oder Enterprise für unbegrenzte Vormerkungen.