In the target area (Building L0516A.E10) of the Super Fragment Separator of the new particle accelerator at the FAIR facility, nine different assembly units (vacuum chamber, magnets, beam catchers) need to be installed. These assembly units are currently still in production, pre-assembly, or stored in GSI halls. Some of the assembly units are so heavy that, after test assembly, they must be transported, lifted, and reassembled at the final location in a disassembled state. A hall crane with a load capacity of 80 tons is available for installation. The scope of work includes frequent on-site presence during the planning phase and permanent presence during the execution of the assembly. The contractor is responsible for independently planning the individual assembly steps as well as preparing the technical specifications and requirements for subcontracting the assembly to suitable specialized companies. Subsequently, the bids are to be evaluated and prepared for awarding. FAIR GmbH will then handle the awarding process, while the contractor will execute and supervise the assembly on-site at the construction site.
Nine assembly units must be installed at their final location in Building L0516A.E10 on the FAIR premises and aligned with millimeter precision to the beamline. This assembly service will be carried out by third parties. The contractor (AN) is responsible for carrying out the detailed planning of the assembly process, preparing the required tender documents, describing the scope of the individual assembly steps, and ensuring compliance with the GSI/FAIR tendering guidelines.
Für diese Ausschreibung liegen keine Vergabeunterlagen vor. Die KI-gestützte Dokumentenanalyse kann nur durchgeführt werden, wenn Dokumente verfügbar sind.
Noch keine Vergabeunterlagen verfügbar.
Nachweis eines zertifizierten ISMS für den gesamten Projektzeitraum.
Sämtliche Kernmitglieder müssen Deutschkenntnisse auf C1-Niveau nachweisen.
Mindestens drei vergleichbare Projekte in Bundes- oder Landesbehörden in den letzten 5 Jahren.