The Facility for Antiproton and Ion Research (FAIR) will be one of the leading-edge particle accelerator facilities for basic research as well as applied science experiments. The FAIR project is an international collaboration of 16 partner organisations. The project is currently being built at the GSI complex and is designed to work in conjunction with the existing GSI system.
For the High Energy Beamtransferlines (HEBT), 15 vacuum chambers for dipole magnets are required. These are operated in a pressure range of 1x10-7 - 1x10-8 mbar. They are rectangular vacuum chambers with different bending radii and lengths. One of the vacuum chambers requires a bellows on one side. The material to be used and the individual criteria can be found in the specification and drawings
Für diese Ausschreibung liegen keine Vergabeunterlagen vor. Die KI-gestützte Dokumentenanalyse kann nur durchgeführt werden, wenn Dokumente verfügbar sind.
Noch keine Vergabeunterlagen verfügbar.
Nachweis eines zertifizierten ISMS für den gesamten Projektzeitraum.
Sämtliche Kernmitglieder müssen Deutschkenntnisse auf C1-Niveau nachweisen.
Mindestens drei vergleichbare Projekte in Bundes- oder Landesbehörden in den letzten 5 Jahren.