FA Disconnectors and Earthing Switches GE 2026-2030

Lose

3 Lose

The subject of this Lot is the design, manufacturing, testing (FAT), transport, unloading, tuning and optional on-site services for disconnecting and earthing switches for German DS substations executed by 50Hertz, including necessary accessories as well as training services for a period of 3 (+1+1) years. Equipment: 72.5 – 123kV Disconnecting and Earthing Switches

The subject of this Lot is the design, manufacturing, testing (FAT), transport, unloading, tuning and optional on-site services for disconnecting and earthing switches for German (50Hertz) substations, including necessary accessories as well as training services for a period of 3 (+1+1) years. Equipment: 245 - 420kV Disconnecting and Earthing Switches

The subject of this Lot is the design, manufacturing, testing (FAT), transport, unloading, tuning and optional on-site services for disconnecting and earthing switches for German (50Hertz) TSO substations, including necessary accessories as well as training services for a period of 3 (+1+1) years. Equipment: 72.5 – 123kV Disconnecting and Earthing Switches

KI-Analyse

Keine Dokumente vorhanden

Für diese Ausschreibung liegen keine Vergabeunterlagen vor. Die KI-gestützte Dokumentenanalyse kann nur durchgeführt werden, wenn Dokumente verfügbar sind.

KI-Analyse-Kontingent erschöpft

0 / 0

Dein aktueller Plan hat das KI-Analyse-Limit erreicht. Upgrade auf Professional für mehr Analysen — oder Enterprise für unbegrenzte.

Vergabeunterlagen

Noch keine Vergabeunterlagen verfügbar.

Vormerkungen-Limit erreicht

0 / 5

Im Basis-Tarif kannst du bis zu 5 Ausschreibungen vormerken. Hol dir Professional für bis zu 100 — oder Enterprise für unbegrenzte Vormerkungen.