FA Disconnectors and Earthing Switches GE 2026-2030
The subject of this Lot is the design, manufacturing, testing (FAT), transport, unloading, tuning and optional on-site services for disconnecting and earthing switches for German DS substations executed by 50Hertz, including necessary accessories as well as training services for a period of 3 (+1+1) years. Equipment: 72.5 – 123kV Disconnecting and Earthing Switches
The subject of this Lot is the design, manufacturing, testing (FAT), transport, unloading, tuning and optional on-site services for disconnecting and earthing switches for German (50Hertz) substations, including necessary accessories as well as training services for a period of 3 (+1+1) years. Equipment: 245 - 420kV Disconnecting and Earthing Switches
The subject of this Lot is the design, manufacturing, testing (FAT), transport, unloading, tuning and optional on-site services for disconnecting and earthing switches for German (50Hertz) TSO substations, including necessary accessories as well as training services for a period of 3 (+1+1) years. Equipment: 72.5 – 123kV Disconnecting and Earthing Switches
Für diese Ausschreibung liegen keine Vergabeunterlagen vor. Die KI-gestützte Dokumentenanalyse kann nur durchgeführt werden, wenn Dokumente verfügbar sind.
Noch keine Vergabeunterlagen verfügbar.
Nachweis eines zertifizierten ISMS für den gesamten Projektzeitraum.
Sämtliche Kernmitglieder müssen Deutschkenntnisse auf C1-Niveau nachweisen.
Mindestens drei vergleichbare Projekte in Bundes- oder Landesbehörden in den letzten 5 Jahren.