The shielding concrete beams are needed as crucial infrastructure of the CBM Cave as they provide mounting positions for detectors and other infrastructure. They also act as cover for the electronics and control systems of the experiment and shield these components from high doses of radiation.
Scope of delivery: - Manufacturing of functional parts based on the design and the requirements given in this document. Specifically, 25 pieces of concrete of type A (6.7m length), 2 pieces of type B (7.5m length) and 24 pieces of type C (7.8m length). - Provide construction drawings and all related documentation, including a Bill of Materials if required. - Delivery of all manufactured parts to the building L0608A of the FAIR construction site
Für diese Ausschreibung liegen keine Vergabeunterlagen vor. Die KI-gestützte Dokumentenanalyse kann nur durchgeführt werden, wenn Dokumente verfügbar sind.
Noch keine Vergabeunterlagen verfügbar.
Nachweis eines zertifizierten ISMS für den gesamten Projektzeitraum.
Sämtliche Kernmitglieder müssen Deutschkenntnisse auf C1-Niveau nachweisen.
Mindestens drei vergleichbare Projekte in Bundes- oder Landesbehörden in den letzten 5 Jahren.